2021-07-23 10:35FKJ-GT (Grid-tie) model On grid Wind Turbine Controller Product Characteristics
1.The product is manufactured according the JB/T6939.1-2004 industrial standard and GB/T
19115.1-2003 national standard also with users’ technical requirements.
2.Big LCD display.The images tell working state visually.Various data show: real-time wind
turbine voltage,current,solar panel voltage,current,DC output voltage,current,total power
generation(The main board is with button battery,in case of power failure, history data can
be saved for 30 days)
3.Two sets of control systems:PWM constant voltage system and three-phase dump load
system.
4.PWM constant voltage control is 120% of the rated power of the wind turbine. In case
exceeding of PWM’s capacity, the three-phase dump load will automatically start immediately.
After 10-20 minutes, the three-phase dump load will stop and the wind turbine will re-start to
resume power supply to ensure the safe running of the overall wind turbine generation system.
5.When the strong or super-strong wind conditions, the controller can conduct constant voltage output to ensure the inverter safety running.
6.When the condition of disconnected grid-connected inverter, the controller can conduct
constant voltage output and wait for inverter resumption.
7.When the grid is cut off, the three-phase dump load of the controller will automatically start
to work and the inverter will stop output to grid. When the grid resuming, the controller stops
three-phase dump load and the inverter will resume power supply.
8.The inside of the controller is equipped with surge protector. Contain the over voltage into
the wind turbine under the bearable voltage of the equipment or system. On another way, to
conduct the strong lightening current into the earth directly to avoid any damage of equipment.
9.The controller is equipped with emergency stop switch; in case of emergency, press down the emergency stop button in the front panel to cut off all power supply of the controller and the
wind turbine will immediately brake(three-phase dump load).
10.The controller is equipped with manual three-phase dump load switch. To using this switch,
the wind turbine will brake (three-phase dump load).
※ Adopt Modbus Communication protocol. Convenient to carry out the secondary development.
※ Adjusting the technical specification via RS485 is available.Convenient to adjust the different wind turbines for professional customers.
※ Support WIFI and GPRS.Customers can monitor the real-time working state of the on grid wind power system via PC and mobile and query history working sate.Both Android and OS are compatible in Mobile.
※ Can increase the solar panel control system according to customer requirements.
※ For the different wind turbine, the controller can be equipped with mechanical yawing, rotate tail control, furled empennage, mechanical brake,hydraulic brake, electromagnetism brake and other brake functions.